Project

 

The Section 8 of the A89 expressway crosses the valley of the Sioule River with a 991m long viaduct, 150m above the river.

 


Services

 

setec tpi carried out the design and construction management, which included:

  • Producing the tender documents
  • Supervising the construction work

 

 


Key information

 

Client: Motorways of South France

Design JV: MIKAELIAN Architect, setec tpi (Design and Construction Manager), SECOA (Designer)

Duration: 2003-2005


 

Les VSP des grands fléaux de dimensions 10 m de hauteur et 18,60m de longueur pour un volume 800 m³ sont bétonnés en 5 phases.

  • 135 m hauteur piles
  • 20000 m3 béton (tablier)
  • 1200 t de précontrainte