The Moulin and Guy Môquet tunnels opened in 1990. This modernisation project was part of a framework for the modernisation of all underground structures of 300m or more.
Services
setec tpi’s assignment is to carry out the full Design & Construction Project Management for the safety standardisation of the tunnels of the Moulin and Guy Môquet in Thiais on the A86, in accordance with the recommendations of the technical instruction of the circular no. 2006-20 relating to the safety of road tunnels longer than 300 m.
This assignment includes the phases:
- Diagnosis (DIA)
- Preliminary studies (AVP)
- Design Project (PRO)
- Tender documents (DCE)
- Execution studies (EXE-SYNTHESE)
- Construction Design review (VISA)
- Supervision of construction works (DET)
- Assistance to the contractor for the acceptance of works (AOR)
- Scheduling, control and coordination (OPC).
Key information
Client: DIRIF (Interdepartmental Roads Department)
Project management JV: setec tpi, Ségic
Project cost: 22M€
Duration: 2014 – 2018